Community Baptist Church-BGW, VA

This new 20,300 square foot building in South Riding includes a new sanctuary and space for offices and classrooms. The pre-engineered metal building has a veneer of brick-look stucco. This project was completed in 2009. The church members were highly involved in this project through their Ministry of Construction. Through the efficient Koretech panels (which provide higher R-value than standard insulation) and the upgraded mechanical system, the Church should have significantly lower-than-normal operating/life-cycle costs.     >>More

Airlie Center Pavilion, VA

Renovations to Airlie Center's pavilion to enclose the existing pavilion and add geo-thermal heating and air conditioning, as well as extend the pavilion to include a veranda.  This project will be LEED certified.
Construction was started on May 25th, and is scheduled to finish in August.
    >>More

Keen Residence Garage, VA

New detached garage for a residence.  Structure will be pre-engineered metal building with metal panel skin, composite roof system, and four overhead doors.    >>More

Dominion Virginia Power Orange Transmission Building, Orange, VA

This project is a pre-engineered metal building on a concrete slab with offices and warehouse space.  A fast-track project, DCG plans to finish this project in 3 months.  DCG is working on this project with Shoosmith Construction.    >>More

Mt Zion Baptist Church, VA

Completed in 2010, this new building has a 1200 seat sanctuary, a multi-purpose gym, offices, and classrooms. Project includes new entrance and new parking lot with new utilities. This pre-engineered metal building has a brick and split-face block veneer. The insulating air-entrained auto-claved (AAC) block in the exterior walls of this building, along with an upgraded mechanical system will help keep this church's life-cycle cost lower than what would be expected.     >>More

Smith Medical Office, VA

Professional office building including tenant finishes for a doctor's office. Project included all site work, utilities, wood framing, brick veneer, elevator, and partial tenant finishes.    >>More

Olde Ashburn Center (Building I), VA

New retail and office building. 23,000 square feet, steel framing, brick and stucco exterior. Completed March 2009. Building includes high-end common areas, sprinkler system, mechanical systems, and elevator.    >>More

Wilcox Conservancy, Petersburg, VA

This new pavilion for the Willcox Conservancy park has structural steel columns and wood trusses.  It will have a metal roof, fiberglass columns surrounds, and masonry column bases.    >>More

Bethia United Methodist Church, VA

14,200 square foot expansion of existing church. New areas include a gym, commercial kitchen, classrooms, elevator, and restrooms. Completed in 2010. Through the Ministry of Construction (whether it is praying for the workers on site, providing fresh coffee and donuts to the jobsite, or just saying a thank-you to the construction crews), the members of the church were highly involved in this project.    >>More

Checkers Restaurant , VA

Site work and utilities for new modular building. DCG was responsible for coordination of utilities, coordination of modular building installation, and installation of parking lot, included colored concrete patio area.    >>More

South River Tower, Edgewater, MD, MD

Retail and office building. DCG was responsible for all site work, utilities, and shell building construction. Wood frame with siding and Azek exterior trim, shell building work included all electrical, mechanical, plumbing, sprinkler systems, and elevator.    >>More

Town n Country Restaurant, VA

Renovation and restoration after a building fire. DCG's work included new mechanical systems, and refinishing of dining room areas.    >>More

V&V Commercial, MD

Retail and office space including Tae Kwon Do studio. This project was completed in 2008. It is a pre-engineered metal building with masonry and stucco facade.    >>More

Carver Square, MD

This retail and office center contains 40,000 square feet. DCG was responsible for the site work, icnluding a state of the art underground storm water management system. The building is masonry and steel construction. DCG was also responsible for several tenant spaces in the building.    >>More

AAAACO Auto Parts, VA

Site work and design/build project for a new pre-engineered metal building for this auto parts yard in Lorton.  Interior will have warehouse space and offices.    >>More

Mt. Zion Baptist, Fredericksburg, VA

Addition to existing church, including new sanctuary, classrooms, offices, and restrooms. New parking area is pervious paving to comply with environmental quality recommendations. New sanctuary has vaulted ceiling, baptistry, and sound room. Project also includes new entrance courtyard. The church was able to keep costs down by working with the volunteer missionary group Men on a Mission to provide the labor for the framing carpentry on the project. DCG worked with the volunteer carpenters to ensure accurate interpretations of the plans and quality work. Completed in 2009.     >>More

Warrenton Baptist Church Entrance Site Work, VA

New entrance and site work for existing church.    >>More

Angler Environmental, VA

Completed in 2007, this new building houses office space for Angler Environmental. The 13,200 SF building incorporated several LEED environmentally friendly building components. This negotiated contract project was a result of a partnership between DCG, the owner, and the architect.    >>More

GMU President's Park Phase 2B, Virginia

This fast-paced project was completed over the summer of 2010. Starting on May 17 (the day after the students left for their summer break) DCG removed all furniture, roofing, doors, carpet, ceilings, air conditioning/heating equipment, electrical panels, lights, and wiring. By August 1, we had replaced all of these systems, added a completely new sprinkler system and were starting up the systems. By August 10th, the dorms were ready for students to move back in!    >>More

Kform, VA

Design/build project for a new pre-engineered metal building addition to this manufacturing facility in Sterling, VA.  www.kform.com

    >>More

Republic National Distributors, Washington, DC

This project is a repair to the Republic National Distributors building in DC. A truck struck the buidling, causing structural damage to the steel and masonry. DCG is repairing the masonry, steel, and working with the overhead door company. DCG is working with the owner's insurance company to make sure that the repairs are covered by the owner's insurance.    >>More

Lord Fairfax Community College Sitework for Modular Buildings, VA

Completed in the summer of 2010, this project included the sitework and utilities for new modular classroom facilities at the Warrenton Campus of Lord Fairfax Community College. DCG also completed a deck and handicap ramps for access to the buildings, as well as modifications to the parking lot for handicap access.    >>More

American Disposal, VA

DCG is providing and erecting the pre-engineered metal building for this project in Manassas.    >>More

Hamlet Swimming Club, VA

Renovation of a pool club house. DCG added a second story to this existing building; gutted the interior and did a complete renovation to update the bath house and add a community gathering room, including a large deck and small elevator/lift. This renovation also included the addition of a sprinkler system.    >>More

Hogan & Sons, South Riding, VA

This auto service and tire facility with corporate offices was completed in 2009. It is 11,000 square feet: steel structure with brick veneer and storefront. This was a design-build project.    >>More

Grace Baptist Church, VA

Completed in 2010, this project included a new education building housing classrooms and offices; a sanctuary renovation; and an addition to the sanctuary building. Working with the church, DCG was able to keep the church operating during construction.    >>More

Flat Run Baptist Church, VA

This project included a new 200 seat sanctuary and new parking lot. Also part of the project was a new entrance. This 7500 sf building is a pre-engineered metal building with brick veneer.    >>More

Fauquier County Larry Weeks Pool Patio Expansion, Vint Hill, VA

A patio expansion at the Larry Weeks Community Pool for the Fauquier County Parks & Recreation Department with radius design, including fencing.    >>More

Grace Baptist Church Kitchen Renovation, VA

This renovation of Grace Baptist's commercial kitchen includes new flooring, new pass-through roll-up shutter, and new commercial kitchen hood and fire suppression system.     >>More

Children of America, MD

This tenant fit-out for Children of American is in the Eric CHadwick Building in Crofton, MD. It is a 10,000 SF child care center.    >>More

Jefferson Center, MD

This retail strip shopping center included tenant finishes for The Big Screen Store. Completed in 2007, this project included all site work, utilities, steel framing, block veneer, parking lot, and complete electrical and mechanical systems for future tenants.    >>More

Checkers, VA

Checkers Restaurant near the Lowe's in Winchester. The modular building previously in use in Manassas Park was relocated to the Winchester site. Project included site utilities, patio with colored concrete, new parking areas, and updating the electrical systems in the building.    >>More

Grace Covenant Site-work, VA

DCG is currently installing underground utilities and the church's new parking lot in preparation for their new sanctuary (see DCG's future projects).    >>More

Grace Covenant Demolition, VA

DCG is currently performing the demolition and sitework for the Grace Covenant Church. The building is expected to start in 2011. The church is converting an old water park into a new facility and parking lot.    >>More

JR Warehouse, VA

Three warehouse buildings on one site, including partial tenant finishes. Pre-engineered metal buildings with partial masonry veneer, storefronts, and warehouse space.    >>More

Encore Dance Studio, VA

Tenant fit out for new Dance Studio, including specialty floors, special painting, sloped drop ceilings, full electrical and mechanical systems.    >>More

Five Star Plaza, VA

Completed in 2010, this is a 7100 square foot retail center with parking garage beneath.     >>More

Clea Investments, VA

Renovation to several retail spaces in old town Warrenton. Included restoration to storefront of building. Also included extensive interior renovations such as refurbishing wood floors, refurbishing tin ceiling tiles, updating and adding handicap accessible restrooms.    >>More

JR Warehouse Tenant Truck Bay Expansion, VA

This is a tenant fit-out inside the JR Warehouse buildings (completed by DCG in 2007). It includes a glass folding door, as well as electrical work and other interior modifications.    >>More



Virginia General Contractor & Builder

Dominion Construction Group, your General Contractor, Builder, & Architect of Fredericksburg, Virginia, is the company you can trust for any construction project.
Virginia Architect